Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/jefuller/wp-includes/functions.php on line 6121
Regulation and Policy :. JE Fuller

Regulation and Policy

Successful completion of engineering projects has become increasingly reliant upon the navigation of a complex regulatory framework to obtain necessary clearances and permits. JE Fuller’s professional staff has developed expertise and has gained experience in assisting our clients to obtain permits in a timely manner. A thorough understanding of regulatory and permit requirements informs the study or design process so that engineering products meet the basic permit requirements with the first submittal.

Slide1

The primary regulatory arenas served by JE Fuller are related to:

  1. Floodplain management regulations by the Federal Emergency Management Agency (FEMA).
  2. Clean Water Act permits (404 and 401) by the Regulatory branch of the U.S. Army Corps of Engineers.
  3. Storm Water Permits by the U.S. Environmental Protection Agency (EPA), which are implemented in Arizona by the Arizona Department of Environmental Quality (ADEQ).
  4. Permits for material extraction from watercourses from Sand and Gravel mining.